Environmental
Master Plan - Iron and Steel Production (South Africa)

The site from the North
Within South Africa, we were commissioned by a large coal
gasification, iron ore processing, steel production, rolling
and finishing facility to critically review tender proposals
for a treatment plant for organic effluents (COD, ammonia
and dissolved salts removal). The intended plant, a biological
nitrification and denitrification system following by reverse
osmosis (RO), evaporator and salts crystallisation facilities
had an intended capacity to treat 8000 cubic metres per day.
Refractory COD issues necessitated the inclusion of activated
carbon to ensure compliance against very restrictive discharge
criteria. There were also potential issues associated with
biocidal components which could be present in variable quantities
within the raw effluents.
We reported on the technical and economic efficiencies of
the different tender proposals and also on their overall appropriateness
relative to the real needs of the site.
As a result, RPA were commissioned as part of a multi-disciplinary
team of specialist consultancies to develop the most cost
effective overall holistic Master Plan strategy for the site
as a whole so as to deal with all:
- Production wastes – both for historic on site deposits
and for ongoing production;
- Production effluents;
- Spillages – including appropriate remediation and
future containment;
- Atmospheric emissions and the handling of the resultant
residue streams;
- Rainfall runoff – both contaminated and clean;
- Ground water contamination;
- Existing landfill deposits and their remediation;
- Contamination from raw materials.

Iron and Steel Production from the South West
This work included both the development of the optimum long
term strategy and the selection and design of interim measures
to arrest or mitigate the more significant impacts from the
ongoing operations whilst the long term measures are developed,
approved, designed, built and brought into operation.
The production facilities at this site occupy about 1500
hectares within a total site area (production, raw materials
storage, product handling waste deposits and other working
areas) of about 4000 hectares.
A natural water shed line divides the site into two almost
equal areas. As a result of the above referred interim measures,
all contaminated discharges to surface water from the one
half of the site were stopped. This was achieved by a combination
of containment, reduction at source and redirection to appropriate
treatment and re-use.
As a result of specific RPA proposals:-
- A series of carefully integrated containment and spillage/leakage
prevention measures were implemented. This achieved the
stopping of all net process inputs and storm water overflows
to the large on-site storage and evaporation lakes. Arguably
the most environmentally sensitive lake was emptied and
the inventory of the remainder is reducing rapidly.

Lagoons and Residues (as they were)
- The pipework, the operating concepts and the controls
for the on-site treatment facility for the more concentrated
process effluents were rearranged. This enabled almost half
of the processing stages to be shut down, reagent usage
was more than halved, residues production was reduced to
<25% and all treatment quality criteria were brought
into compliance.
- Using adaptations to existing infrastructure and pipework,
a scheme was successfully implemented whereby weaker (but
none the less environmentally sensitive) inorganic discharges
were directed without additional treatment to other site
uses, thereby simplifying and greatly reducing the overall
site effluent treatment requirements and reducing the raw
water needs of the site.
- A second similar strategy was developed whereby the site’s
principal source of organically contaminated effluents is
being more than halved and then the remainder will be used,
without additional treatment, for other site uses as a replacement
for raw water. This scheme has removed the need for a biological
effluent treatment facility at the site.
- An overall holistic strategy for handling, re-using and
recovering all the remaining site produced effluents (a
total of over 1000 m³/hr) and contaminated run-offs
(including landfill leachates and contaminated ground waters)
was developed whereby the total site will be able to become
a zero effluent facility. This scheme is currently going
through its tender adjudication stages prior to implementation.
- In conjunction with site staff and others, RPA took the
technical lead in developing a new technology for the quenching
of hot off-gasses and the wet scrubbing of sub micron sized
dust from those off-gases. This technology is undergoing
the latter stages of pilot plant development prior to implementation
on a 60 Nm3/s demonstration plant. This technology is expected
to be very commercially and functionally attractive relative
to the only alternative, namely wet electrostatic precipitators.
The technology is also able to utilise a heavily contaminated
waste water as its only source of make up water.
- Following initial exploratory testwork, RPA has been commissioned
to develop and demonstrate a suitable waste stabilisation
process whereby all non-recycled/non re-used production
residues, silt from the former storage and evaporation lakes
and all effluent treatment and desalination plant residues
are converted into a sufficiently stable and low risk product
to make it suitable for long term on-site disposal.